Author = Amirhossein Amiri

Design of Risk-adjusted Bernoulli EWMA Control Chart with Estimated Parameters 

Volume 9, Issue 1, Spring 2019, Pages 1-10

Razieh Ashrafi Nasrabadi, Amir Hossein Amiri

Abstract  Typically, in order to evaluate the performance of control charts in the healthcare, the parameters of the control chart are assumed to be known; although usually in practice, these parameters are unknown, and the process parameters should be estimated in Phase I for process monitoring. When the estimated parameters are used instead of their known values, the performance of the control chart is affected. In this paper, first, a risk-adjusted Bernoulli EWMA control chart is proposed. Then, the effect of parameter estimation on in-control performance and out-of-control performance of the proposed control chart is examined. After that, the methods of increasing sample sizes as well as modifying the control limits are used to reduce this effect. The results of simulation studies are reported in terms of average run length, standard deviation of run length and coefficient of variation of run length criteria. The simulation results confirm the reduction of the effect of the parameters estimation by increasing the sample size and correcting the control limits. 

Monitoring Auto-Correlated Multivariate Simple Linear Profiles in Phase I under AR(1) and MA(1) Models

Volume 8, Issue 1, Spring 2018, Pages 1-7

Mohammad Taghipour, Amirhossein Amiri, Abbas Saghaei

Abstract In some Problems, quality of a process or a product is described by a relationship between one or more response variables and one or more explanatory variables. In the case that the response variables are correlated, quality of a process or a product can be characterized by a multivariate Profile. In some situations, the values of response variables in a Profile are auto-correlated due to the time collapse between two successive samples. The autocorrelation affects the regression parameters estimates and as a result, the performance of control charts in detecting shifts deteriorates. In this paper, an auto-correlated multivariate simple linear profile is considered and assumed that the autocorrelation can be described by AR (1) and MA(1) models. Then, two control charts for monitoring the multivariate simple linear profiles are suggested. The Performance of the proposed control charts are compared in Phase I by using simulation in terms of Power criterion.

Investigating the effect of estimating ARCH model parameters on financial process control charts

Volume 7, Issue 2, Summer 2017, Pages 106-113

Mohammad Hadi Doroudyan, Mohammadsaleh Avlia, Amir Hossain Amiri, Hojatollah Sadeghi

Abstract Identifying significant changes in key indicators of financial processes is one of the points of interest in recent years and after the financial crisis. Control charts are one of the most powerful tools used in this field. A noteworthy point in the practical use of control charts is the estimation of process parameters based on available data. Despite extensive research into the effect of parameter estimation on the performance of control charts, little research has been done on processes with time-dependent observations. Due to the importance and widespread use of the Auto Regressive Conditional Heteroskedasticity (ARCH) time series model in monitoring financial processes, in this paper, the effect of prototype size for estimating model parameters on the performance of phase 2 control charts is investigated. The performance of each control diagram is evaluated using simulation studies based on AARL and SDARL criteria and the results are described.

Investment Alliance Defense Systems with Reliability Improvement Approach

Volume 6, Issue 3, Autumn 2016, Pages 146-157

Amirhossain Amiri, Mahdi Rahimdel maybodi, Mahdi Karbasian

Abstract Today, the defense of sensitive areas and resources is a fundamental issue that encompasses all key infrastructures, and to achieve the goal of reducing the damage and injuries caused by the attacker, the use of informed and useful strategies is necessary. In this research, modeling is considered to optimize the protection of investment systems that have a series-parallel reliability structure and have a functional correlation with each other. In general, in this study, first considering the functional independence of subsystems, the probabilities of a successful attack, the system reliability structure and the game theory approach to finding the equilibrium point, a nonlinear programming model is proposed to determine the investment defense of systems. Then, by determining the reliability relationships despite the functional correlation between the subsystems, a linear programming model is introduced to determine the correlation coefficient of the subsystems and to redistribute investment to defend the systems. Finally, the proposed research model is used for a numerical example and the results are analyzed.

Estimation of the point of change in the multivariate normal process covariance matrix using neural networks

Volume 6, Issue 1, Spring 2016, Pages 21-34

Amirhossain Amiri, mohammadreza Maleki, Mohammadhossain Kalani

Abstract In most cases, the alert received from a control chart does not indicate the actual time of the process change due to the delay between the actual change time and the time of receiving the alert from the control chart. As a result, it is necessary to examine the real time of change, which is referred to as the "point of change". By reviewing the literature on identifying real-time process changes, it can be concluded that most research in this field focuses on univariate processes and little research is devoted to multivariate processes. In addition, most research in the field of estimating change time in multivariate processes has focused on changes in the mean process vector, and only one research has been done on the covariance matrix. In this paper, a model based on artificial neural network is proposed to estimate the point of change in the covariance matrix of multivariate normal processes. The method presented in phase 2 is control diagrams and the type of change that occurred in the variance of qualitative characteristics is assumed to be the type of step changes. The performance of the proposed method in estimating the change point is evaluated based on two criteria of experimental distribution of estimates as well as the mean and standard deviation of the change point estimator for different step shifts in the variance of process variables in a simulation study. Finally, in order to further explain the proposed method, a numerical example is provided. The results show the proper performance of the proposed method in estimating the change point in the covariance matrix of multivariate normal processes.

Design of an adaptive control chart with variable sampling intervals using the maximum exponentially weighted moving average (EWMA) of squared deviations

Volume 5, Issue 1, Spring 2015, Pages 1-12

Amir hossain Amiri, Atena Rahimi Jafari, Reza Kamranrad

Abstract Control chart is one of the most widely used statistical control tools of processes that plays an important role in improving their quality. One of the weaknesses of its low speed control diagrams is the detection of changes in the process parameter. To this end, adaptive control charts have been developed to improve the performance of control charts to detect small changes. In this paper, the adaptive method of variable sampling distance is used to improve the performance of the control chart of the maximum exponentially balanced moving average squared-exponential moving average squared deviation to detect changes in mean and variance and simultaneous changes in mean and variance. The performance of the proposed method is compared with the sampling control diagram at fixed intervals using simulations and the criteria of mean time to alert and moderate time to alarm occurrence. The results show that the proposed method performs better than the control chart results in the research literature for large changes.

Monitoring Two-Stage Processes with Gamma-Distributed Outputs Using Generalized Linear Models and the Inverse NORTA Method

Volume 2, Issue 1, Spring 2012, Pages 50-55

Amirhossein Amiri, Ali Asgari, Mohammad Hadi Douroudian

Abstract Nowadays, most manufactured products are produced through multiple interdependent process stages. Due to the cascading nature of many such processes, monitoring them using conventional control charts often leads to unavoidable errors and incorrect decisions. One of the useful charts for monitoring multistage processes is the deviation-based control chart. These types of charts have mostly been applied to normally distributed quality characteristics.
In this paper, a two-stage process is examined in which the quality characteristic in the second stage follows a gamma distribution, and the deviation-based control chart is employed for monitoring this process. The test statistic of the deviation-based control chart is derived from combining the inverse NORTA method with a generalized linear model.
To evaluate the performance of the proposed method, the Average Run Length (ARL) index is used, and the results are compared with the best existing method in the literature. The findings indicate that the proposed approach performs better in detecting both upward and downward shifts.

Detection of Change Points in Poisson Regression Profiles with a Linear Trend

Volume 1, Issue 1, Winter 2011, Pages 39-44

Alireza Sharafi, Majid Amin Niri, Amirhossein Amiri

Abstract Control charts are among the most important tools in statistical process control, used to monitor the extent of variation in a process. When a assignable cause deviation is observed in a control chart, identifying the root causes of the change and determining the time at which the deviation began—referred to as the change point—is crucial and impactful. In some statistical process control problems, the quality of a product or the performance of a process is described by the relationship between a response variable and one or more independent variables, known as a profile. In many applications, such as calibration, this relationship is described by a linear profile, while in other situations more complex models, such as Poisson regression profiles, are required. In this paper, the maximum likelihood estimation method is employed to detect change points in Phase II monitoring of Poisson regression profiles, and its performance is evaluated through simulation.