[1] Calvin, T. (1983). Quality control techniques for" zero defects". IEEE Transactions on Components, Hybrids, and Manufacturing Technology, 6(3), 323–328. https://doi.org/10.1109/TCHMT.1983.1136174
[2] Chan, L. Y., Xie, M., & Goh, T. N. (2000). Cumulative quantity control charts for monitoring production processes. International Journal of Production Research, 38(2), 397–408. https://doi.org/10.1080/002075400189482
[3] Xie, M., Goh, T. N., & Ranjan, P. (2002). Some effective control chart procedures for reliability monitoring. Reliability Engineering & System Safety, 77(2), 143–150. https://doi.org/10.1016/S0951-8320(02)00041-8
[4] Borror, C. M., Champ, C. W., & Rigdon, S. E. (1998). Poisson EWMA control charts. Journal of Quality Technology, 30(4), 352–361. https://doi.org/10.1080/00224065.1998.11979871
[5] Chakraborti, S., Kumar, N., Rakitzis, A. C., & Sparks, R. S. (2014). Time between events monitoring with control charts. Wiley Statsref: Statistics Reference Online, 1–13. https://doi.org/10.1002/9781118445112.stat08409
[6] Mirzaei Novin, M., Amiri, A., & Castagliola, P. (2026). A comprehensive review of time between events control charts: Models, applications, and future directions. Applications, and Future Directions. https://doi.org/10.1016/j.cie.2025.111789
[7] Zhang, C. W., Xie, M., Liu, J. Y., & Goh, T. N. (2007). A control chart for the Gamma distribution as a model of time between events. International Journal of Production Research, 45(23), 5649–5666. https://doi.org/10.1080/00207540701325082
[8] Wang, F.-K., Bizuneh, B., & Abebe, T. H. (2017). A comparison study of control charts for Weibull distributed time between events. Quality and Reliability Engineering International, 33(8), 2747–2759. https://doi.org/10.1002/qre.2238
[9] Wu, Z., Jiao, J., & He, Z. (2009). A single control chart for monitoring the frequency and magnitude of an event. International Journal of Production Economics, 119(1), 24–33. https://doi.org/10.1016/j.ijpe.2009.01.004
[10] Qu, L., Wu, Z., Khoo, M. B. C., & Castagliola, P. (2013). A CUSUM scheme for event monitoring. International Journal of Production Economics, 145(1), 268–280. https://doi.org/10.1016/j.ijpe.2013.04.048
[11] Cheng, Y., Mukherjee, A., & Xie, M. (2017). Simultaneously monitoring frequency and magnitude of events based on bivariate gamma distribution. Journal of Statistical Computation and Simulation, 87(9), 1723–1741. https://doi.org/10.1080/00949655.2017.1284846
[12] Rahali, D., Castagliola, P., Taleb, H., & Khoo, M. B. C. (2019). Evaluation of Shewhart time-between-events-and-amplitude control charts for several distributions. Quality Engineering, 31(2), 240–254. https://doi.org/10.1080/08982112.2018.1479036
[13] Rahali, D., Castagliola, P., Taleb, H., & Khoo, M. B. C. (2021). Evaluation of Shewhart time-between-events-and-amplitude control charts for correlated data. Quality and Reliability Engineering International, 37(1), 219–241. https://doi.org/10.1002/qre.2731
[14] Castagliola, P., Celano, G., Rahali, D., & Wu, S. (2021). Control charts for monitoring time-between-events-and-amplitude data. In Control Charts and Machine Learning for Anomaly Detection in Manufacturing (pp. 43–76). Springer. https://doi.org/10.1007/978-3-030-83819-5_3
[15] Wu, S., Castagliola, P., & Celano, G. (2021). A distribution-free EWMA control chart for monitoring time-between-events-and-amplitude data. Journal of Applied Statistics, 48(3), 434–454. https://doi.org/10.1080/02664763.2020.1729347
[16] He, Z., Gao, Y., Qu, L., & Wang, Z. (2022). A nonparametric CUSUM scheme for monitoring multivariate time-between-events-and-amplitude data with application to automobile painting. International Journal of Production Research, 60(18), 5432–5449. https://doi.org/10.1080/00207543.2021.1959664
[17] Xue, L., An, L., Feng, S., Liu, Y., Wu, H., & Wang, Q. (2024). A nonparametric adaptive EWMA control chart for monitoring multivariate time-between-events-and-amplitude data. Computers & Industrial Engineering, 193, 110250. https://doi.org/10.1016/j.cie.2024.110250
[18] Figueiredo, F. O., Castagliola, P., & Malela-Majika, J.-C. (2025). Rank-Based EWMA TBEA Control Chart. Quality and Reliability Engineering International, 41(4), 1279–1292. https://doi.org/10.1002/qre.3711
[19] Scagliarini, M. (2026). Non-parametric time between events and amplitude methods for monitoring regional drought characteristics. Environmental and Ecological Statistics, 1–27. https://doi.org/10.1007/s10651-026-00760-3
[20] Cox, D. R. (1972). Regression models and life-tables. Journal of the Royal Statistical Society: Series B (Methodological), 34(2), 187–202. https://doi.org/10.1111/j.2517-6161.1972.tb00899.x
[21] Andersen, P. K., & Gill, R. D. (1982). Cox’s regression model for counting processes: a large sample study. The Annals of Statistics, 1100–1120. https://doi.org/10.1214/aos/1176345976
[22] Prentice, R. L., Williams, B. J., & Peterson, A. V. (1981). On the regression analysis of multivariate failure time data. Biometrika, 68(2), 373–379.
[23] Wei, L.-J., Lin, D. Y., & Weissfeld, L. (1989). Regression analysis of multivariate incomplete failure time data by modeling marginal distributions. Journal of the American Statistical Association, 84(408), 1065–1073. https://doi.org/10.1080/01621459.1989.10478873
[24] Ahmad, H., Nadi, A. A., Amini, M., & Chakraborti, S. (2026). Dynamic Risk-adjusted monitoring of time between events: Applications of NHPP in pipeline accident surveillance. Quality and Reliability Engineering International, 42(1), 478–502. https://doi.org/10.1002/qre.70066
[25] Chong, Z. L., Teoh, W. L., Khoo, M. B. C., Teh, S. Y., & Khaw, K. W. (2025). Dynamic VSI Max-EWMA control chart for joint monitoring of time-between-events and amplitude in high-quality manufacturing processes. Computers & Industrial Engineering, 207, 111204. https://doi.org/10.1016/j.cie.2025.111204
[26] Alevizakos, V., & Koukouvinos, C. (2020). A progressive mean control chart for monitoring time between events. Quality and reliability engineering international, 36(1), 161–186. https://doi.org/10.1002/qre.2565
[27] Chakraborty, N., Human, S. W., & Balakrishnan, N. (2017). A generally weighted moving average chart for time between events. Communications in Statistics-Simulation and Computation, 46(10), 7790–7817. https://doi.org/10.1080/03610918.2016.1252397
[28] Sanusi, R. A., Teh, S. Y., & Khoo, M. B. C. (2020). Simultaneous monitoring of magnitude and time-between-events data with a Max-EWMA control chart. Computers & Industrial Engineering, 142, 106378. https://doi.org/10.1016/j.cie.2020.106378
[29] Nelsen, R. B. (2006). An introduction to copulas. Springer. https://doi.org/10.1007/0-387-28678-0
[30] Joe, H. (2014). Dependence modeling with copulas. CRC press. https://copula.stat.ubc.ca/