1] Burr, I.W. (1969), Control charts for measurements with varying sample sizes. Journal of Quality Technology, 1, 163-167.
[2] Prabhu, S.S., Runger, G.C. and Keats, J.B. (1993), chart with adaptive sample sizes. International Journal of Production Research, 31, 2895-2909.
[3] Costa, A.F.B. (1997), charts with variable sampling size and sampling intervals. Journal of Quality Technology, 29:2, 197-204.
DOI: 10.1080/00224065.1997.11979750.
[4] Zimmer, L.S., Montgomery, D.C., and Runger, G.C. (1998), Evaluation of a Three-state adaptive sample size control chart. International Journal of Production Research, 36 733-743.
[5] Reynolds Jr, M.R. and Arnold, J.C., (1989). Optimal one-side Shewhart control chart with variable sampling intervals. Sequential Analysis 8, 51–77.
[6] Aparisi, F. (1996), Hotelling's control chart with adaptive sample sizes, International Journal of Production Research, 34, 2853-2862.
[7] Aparisi, F. and Haro, C.L. (2003), A comparison of control charts with variable sampling schemes as opposed to MEWMA chart. International Journal of Production Research 41, 2169–2182.
[8] Ghanaatiyan, R., Amiri, A., Sogandi, F. (2017). Multi-Objective Economic-Statistical Design of VSSI-MEWMA-DWL Control Chart with Multiple Assignable Causes. Journal of Industrial and Systems Engineering, 10(special issue on Quality Control and Reliability), 34-58.
[9] بامنیمقدم، محمد و رفیعی، سعیدرضا. (1396). طراحی آماری- اقتصادی نمودار کنترلی برای دادههای همبسته تحت مدلهای شوک نمایی تعمیم یافته و وایبول، نشریه علمی پژوهشی مهندسی و مدیریت کیفیت.
[10] naderi, M., Bameni Moghadam, M., Seif, A. (2020). Minimum Loss Design of X Control Chart for Correlated Data Under Weibull In-Control Times with Multiple Assignable Causes. Journal of Computational Statistics and Modeling, 1(1), 99-127.
[11] Banerjee, P. K., & Rahim, M. A. (1988). Economic design of–control charts under weibull shock models. Technometrics, 30(4), 407-414.