[1] PMBOK. (2017). A Guide to the Project Management Body of Knowledge. PMBOK Guide6.
[2] Sabzeparvar, M. (2006). Project Control. Tehran: Terme Publishing.
[3] Mootadelro, A. (2019). Investigating the lack of establishing a comprehensive project planning and control system as a problem in project-oriented organizations (along with a case study in three provinces of the country). Science and Engineering Elites, 5(6), 39-47.(in persian)
[4] Kazemi, A., and Fakhouri, P. (2013). Presenting a fuzzy control system to estimate the project completion time in Gert networks. International Journal of Industrial Engineering and Production Management. 23 (2): 251-263.
[5] Farzi Poursaen, R. (1999). Management and Control of Research and Development Projects Using a Possible GERT Approach, The Second Conference of Industries and Mines Research and Development Centers, Tehran, Association of Research and evelopment Centers of Industries and Mines.
[6]Afsar, A., Ziaei, S. J. (2022). Present an Algorithm Based On Gert Method and Monte Carlo Simulation to Manage and Control the Research and Development Projects (Case Study: Model Airplane). ournal of Strategic Management in Industrial Systems,59 (17), 1-24. (in prrsian)
[7] Zaki Dizaji, H. and Manjezi, N. (2018). Provide a network model for time management of overhaul of DerogarNeyshekar.Agricultural Machinery Quarterly. 8 (2): 403-412. (in Persian)
[8] Aliaei, E., Aghabeigi, P. and Jani, A. (2021). Predicting the cost of completing railway construction projects using the intelligent fuzzy-neural inference model. 7th International Conference on Recent Advances in Railway Engineering
[9] Gholamian, S. A. (2017). Presenting an integrated model to control project delays based on the time buffers management approach, Journal of Modeling in Engineering, 16(55), 1-18. (in prrsian)
[10] PMI. (2013). "A Guide to the Project Management Body of Knowledge". PMBOK Guide 5.
[11] Lipke, W. (2009). "Prediction of project outcome, the Application of Statistical methods to earend value managiment and earend schedule performance index". International journal of project management, 400-407.
[12] Atsagher, K. (2013). Advanced Statistical Quality Control, Publications of Defense Industries Educational and Research Institute, Tehran, first edition. (in prrsian)
[13] Akbari, A. A. & Salehipour, A. (2011). Statistical control of time and cost performance indicators in construction projects. Industrial Management Studies, 10(27), 144-166. (in prrsian)
[14] W.H.Lipke. (2012). Further Study Of The Normality Of CPI and SPI(t). The Measurable News, 16-18.
[15] Cynthia A. Lowry, William H. Woodall, Charles W. Champ and Steven E. Rigdon, A. (1992). Multivariate Exponentially Weighted Moving Average Control Chart, Technometrics, 34 (1), 46-53.
[16]
Steven E. Rigdon. (2007). An Integral Equation For the in control Average Run Length of a Multivariate Exponentially Weighted moving Average Control Chart, Journal of Statistical Computation and Simulation, 52 (4), 351-365.
[17] Hotelling, H. (1947). Multivariate Quality Control. Illustrated by AirTesting of Sample Bombsights. Techniques of Statistical Analysis, 111-184.
[18] Noorossana, R., Shekari, M., Saghaei, A. (2012). Introduction to Statistical Quality Control Solution Manual, House of Quality Publishing Co.
[19] Noorossana, R. (2012). Statistical quality control (third edition). Tehran: Publications of the University of Science and Technology.